The Altamont Corridor Express (ACE®) Measure B & BB Funds
Capitalized Maintenance Capitalized maintenance projects funded through Measures B and BB for Fiscal Year 2020/21 include surfacing and replacement of rail for ride quality between Niles Junction and Alameda County/San Joaquin County line, and rehabilitation of grade crossings and switches. The Sunol Quiet Zone Alameda County sponsored a quiet zone that was implemented in the […] Read More The Altamont Corridor Express (ACE®) Measure B & BB Funds
The Altamont Corridor Express (ACE®) Measure B & BB Funds Read More »
Capitalized Maintenance Capitalized maintenance projects funded through Measures B and BB for Fiscal Year 2020/21 include surfacing and replacement of rail for ride quality between Niles Junction and Alameda County/San Joaquin County line, and rehabilitation of grade crossings and switches. The Sunol Quiet Zone Alameda County sponsored a quiet zone that was implemented in the Read More The Altamont Corridor Express (ACE®) Measure B & BB Funds